FAA AIR TRAFFIC CONTROL TOWER (ATCT) BASE BUILDING - CINCINNATI INTERNATIONAL AIRPORT (CVC)


CLIENT: U.S. DEPARTMENT OF TRANSPORTATION/FEDERAL AVIATION ADMINISTRATION (FAA)
LOCATION: ERLANGER, KY
MARKET: AVIATION
TYPE: CONSTRUCTION MANAGEMENT

The project was implemented to address failing sealed building joints in the south exterior elevation of the ATCT base building. The existing building façade comprises pre-cast concrete panels and aluminum framed window systems. Weather leakage was evident at window frame locations as well as at precast concrete joints. Work included sealing the exterior of the south side of the CVG Air Traffic Control Tower with a 45-day completion date. Keo completed project within 5 working days.