In 2003, KEO teamed up with DiClemente Siegel Design Inc. and carried out the Pool Mechanics Assessment. Subsequently, a year later, KEO was awarded the Pool Mechanics Rehabilitation Project. KEO evaluated and carried out remediation services of the pool area humidity problem, revamping the existing HVAC system.
28 Falls Old!
28 Falls Old!
That time of the year is here again!
Thinking Construction? Think KEO! We got it covered, every time.
::BLOCK::
::CONTENT::VIDEO
::BLOCK::