The work included the conversion of two storefronts into one to accommodate the new facility. A new roof was installed, a new entry was added, and the facade was refaced with CMU and brick veneer.
28 Falls Old!
28 Falls Old!
That time of the year is here again!
Thinking Construction? Think KEO! We got it covered, every time.
::BLOCK::
::CONTENT::VIDEO
::BLOCK::